皇冠官方app(www.hg108.vip)是皇冠体育官方信用网线上直营平台app。皇冠官方app开放信用网和现金网代理申请、信用网和现金网会员注册、线上充值线上投注、线上提现、皇冠官方APP下载等业务。

首页社会正文

哈希竞彩游戏源码(www.hx198.vip):TNB, PETRONAS to collaborate on joint feasibility studies on hydrogen and carbon capture

admin2022-10-2914

博彩平台推荐www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。博彩平台推荐上最新博彩平台推荐登录线路、博彩平台推荐代理网址更新最快。博彩平台推荐开放皇冠官方会员注册、皇冠官方代理开户等业务。

KUALA LUMPUR: Tenaga Nasional Bhd (TNB) intends to work with Petroliam Nasional Bhd (Petronas) on joint feasibility studies in the areas of hydrogen and carbon capture with a view to unlocking the commercial value of at least RM10 billion up to 2035, said TNB president and chief executive officer Datuk Baharin Din today.

The decarbonisation efforts would be achieved mainly through a collaborative study to develop a green hydrogen ecosystem and carbon capture and storage (CCS) technology, leveraging both organisations' technical expertise and resources.

In addition, the two companies will repower the retired combined-cycle gas-fired power plant, the Sultan Ismail Power Station (SIPS) in Paka, Terengganu by using gas with hydrogen-ready technology, said Baharin in a statement today.

TNB will be investing RM6.3 billion in the repowering of SIPS using high-efficient Combined Cycle Gas Turbine (CCGT) with hydrogen-ready technology for cleaner energy production.

Baharin said the repowering of the plant will leverage the strengths of both TNB and Petronas; and will serve as a unique pioneering project in deploying green technologies that may be utilised in future power plants.

"This brownfield project will start with the demolition of the existing plant next year and this will take two years. Construction of the project will commence from 2025 and the entire complex is scheduled to be ready in 2030,” he added.

,

哈希竞彩游戏源码www.hx198.vip)采用波场区块链高度哈希值作为统计数据,游戏数据开源、公平、无任何作弊可能性,哈希竞彩游戏源码开放单双哈希、幸运哈希、哈希定位胆、哈希牛牛等游戏源码下载、出售。

,

Upon commercial operation of the plant in 2030, the repowered Paka is projected to generate an average of RM250 million per year in earnings before interest and taxes.

"The repowering of Paka, with a capacity of 1,400 megawatts (MW) will avoid 3.2 million tonnes of carbon dioxide equivalent emission per annum, which is equivalent to the CO2 emitted by approximately 700,000 cars each year,” said Baharin.

As the country’s leading energy corporations, Baharin said TNB and Petronas have been forging cooperation for decades in the development of the energy sector and the betterment of the country.

Both TNB and Petronas have signed a memorandum of understanding (MoU) inked by both on Aug 19 to strengthen collaboration in driving innovative solutions toward decarbonisation, making it a historical milestone in supporting Malaysia’s aspiration to be a carbon-neutral nation by 2050.

"The MoU signals the recognition that our paths must converge, in order to realise a successful and inclusive energy transition for Malaysia. TNB has identified two technologies that will bring sustainable decarbonisation to our thermal assets and these are green hydrogen and carbon capture technologies,” said Baharin.

He added that TNB’s MoU with Petronas formed part of TNB’s accelerated Responsible Energy Transition, which is driven by Petronas' aspiration to be net zero by 2050 and the TNB’s target to reduce its coal capacity by 50 per cent and carbon emission intensity by 35 per cent in 2035.

网友评论

1条评论
  • 2022-10-29 00:10:59

    3月24日,房山警方还打掉了一个非法代驾进京团伙。自今年3月初以来,该团伙窝住在琉璃河地区附近宾馆,以代驾进京为经济来源。其中,穆某(男,35岁)负责在微信朋友圈发布代驾广告,联系到代驾业务后给司机发布任务,代驾司机宋某(男,29岁)、韩某(男,36岁)、孙某(男,36岁)等人到京港澳涿州服务区对接驾驶人和车辆,并引导不符合进京政策的驾驶人绕道进京至窦店服务区,代驾司机驾车行驶至该服务区后交还车辆,并收取500至800元代驾费。目前,4名团伙成员均已被房山分局依法刑事拘留。图个开心

最新评论

热门标签